Product Details:
Payment & Shipping Terms:
|
Drilling Depth Capacity: | 200 Meters BTW | Rod Length: | 1m |
---|---|---|---|
Engine Power: | KUBOTA 23.5Kw | Max Flow: | 54L |
Max Rotation Torque: | 400NM | Max Rotation Speed: | 1300rpm |
Cylinder Push Force: | 24KN | Cylinder Pull Force: | 33KN |
Module Quantity: | 6 PCS | Platform Area: | 3m*3m |
Heaviest Module: | 176 KG | Gross Weight: | 513 Kg |
Highlight: | rc drill rig,portable core drill rig,200 Meters Depth Drill Rig Machine |
EP200G Engineering Geological Exploration Drill Rig Machine 200 meters depth
The world’s first portable hydraulic drilling equipment for geological exploration. It is specially designed
for exploration projects in areas with complex geological characteristics. Its innovative drilling tower is light
weight and easy to be assembled and disassembled. It is widely used for soil sampling, Standard
penetration test(SPT), core sampling, rotary-percussive drilling of anchoring engineering and drop
hammer of grouting engineering.
Technical parameters
Drill depth capacity |
HQ/NTW/BTW Rod length 1.5 m (HQ/NTW/BTW) |
30/100/200m |
Hole Diameter | 96/75.7/60mm | |
Core Diameter | 63.5/56/42mm | |
Engine power | Japan KUBOTA 23.5kw/3000rpm | |
Hydraulic system | Maximum pressure 21Mpa/max Maximum flow 54L/min Water cooler | |
Top drive rotation head |
Maximum toque | 300NM |
Maximum rotation speed | 1300rpm | |
Feed travel (Cylinder drive) | 1.27m | |
Pull/thrust | 33KN/24KN | |
Winch |
Average speed | 150m/min |
Lift | 600kg | |
Were Diameter/Accommodation | 5mm/240m | |
Mast |
5m;Height | |
Drill Angle | 45°-90° | |
Size and weight |
Platform area/Module quantity | 3m X 3m / 4PCS |
Heaviest module/Gross | 176kg / 513kg |
Key Characteristics
1.Light
Modulized design with the heaviest pieceweighing only 176kg.
Aviation aluminum materials used for more than 90% of the framework.
2.Fast
Easy to relocate with the capacity of being assembled or disassembled within 20 minutes.
Thin wool rods, low resistance and high speed penetration.
3.Reliable
Long stroke cylinder, easier to control than the chain.
Global leading brands ensuring stability and relaiblity.
4.Save
No road construction and no infrastructure construction: Time Saving.
Hydraulic coring and drilling. No drilling tower. Energy Saving.
Environmentally friendly. Worry-free.
Low consumption. Cost saving.
Engineering Cases Picture
The successful case is Chong Qing-Kun Ming High-speed railway project. It is located in Yanjin Section,
Shaotong City, Yunnan Provice.Geographic environment is at the hillside area of Wumeng Mountain on the northeastern plateau of Dianchi Lake.Geological Condition is mainly siltstone. We use one EP200
portable drill rig to telocated 4 time within 10 working days with total drilling depth 254 meters.
If you are interested in our portable drilling rigs or you have exploration in hard-to-access areas, please
do not hesitate to contact us.
Sinotechdrill International Co.,Ltd
Contact person: Mr.Liu
Mobile/WhatsApp: 86-18612948866
Email: sale@drillrigmachine.com
Contact Person: Mr. Liu
Tel: 0086-18612948866